  • How does reactive supply behave in relation to voltage under excessive loading?
  • What is the required notification for a Data Planned Outage?
  • What is the purpose of a Maximum Generation / Load Management Alert?
  • What information must be stated during a PJM All Call?
  • If a PJM member's EMS becomes unavailable, what do some members do?
  • What is the frequency bias setting as a percentage of load?
  • How much load is typically required to restore frequency by 1 Hz?
  • What is the time indicated for post-contingency standard transfer limitations?
  • What is the maximum duration for a voltage limit post-contingency when normal conditions are in effect?
  • During system restoration, which strategy is used to maintain frequency above 59.5 Hz?
  • What is the response time for procedures when actual voltage is less than the normal voltage limit?
  • What is the intention of the Post Contingency Local Load Relief Warning?
  • What is a primary characteristic of a dynamic reserve?
  • When should outages exceeding 30 days be submitted for use in the annual FTR auction?
  • How long is the limit for post-contingency thermal limits during a load dump?
  • What is the potential consequence of a post-contingency event in a transmission system?
  • What does DLR stand for in the context of PJM Transmission?
  • How much advance notice is needed for an ICCP Data Link outage request?
  • What does a Voltage Reduction Alert indicate?
  • Outages scheduled for the following planning year that exceed how many days must be submitted via e-DART?
  • What is a key requirement for reporting voltage changes associated with a transformer tap position?
  • What is the minimum connected load per mile for a 500kV/765 kV line that is energized?
  • Which of the following is NOT a component of Synchronized Reserve?
  • What describes the cranking path in the context of transmission systems?
  • For post-contingency thermal limits under normal conditions, what is the specified duration?
  • How quickly must a PJM Member notify the control room about an equipment loss of ≥ 100 kV?
  • What types of generators typically require a voltage schedule?
  • What is the primary reserve requirement based on?
  • What does the Performance Assessment Interval measure?
  • How quickly should a black start unit be brought online in emergency conditions?
  • Synchronous Reserve is primarily used to maintain frequency above what level?
  • How often should updates be provided in the transmission restoration report?
  • What is the slow scan rate for dispatch control valves, security monitoring, and data tracking?
  • What is typically the response to a system status indicating potential reliability issues?
  • If ICCP links and EMS analysis tools fail, what state are they considered to be in?
  • How many hours of run time must Black starter resource operators maintain fuel for?
  • Dynamic reserves can be characterized as which of the following?
  • What are the options for a member when their control center is non-functional?
  • PCLLRW should be implemented for post-contingency exceedances lasting how many minutes?
  • What defines dynamic instability in a power system?
  • What occurs to a Transmission Outage Ticket once it is approved?
  • What type of reserve is required to return an area to a pre-contingency state?
  • What should be done if voltages are decaying to the load dump limit?
  • What is the immediate action to take in the event of a maximum generation request?
  • What impact does phase angle exceeding 90 degrees have on a power system?
  • What is the definition of eDart in the context of transmission tickets?
  • What is a common consequence of not properly managing external load losses?
  • Which pre-contingency thermal limit has the shortest duration for load dump?
  • What duration of outage should be avoided during Peak according to transmission operation standards?
  • A Reactive Reserve Check (RRC) includes which of the following components?
  • Each Member Transmission Owner must have a plan for loss of control center functionality that includes what?
  • What is the expected outcome of issuing a Voltage Reduction Warning?
  • What does dynamic stability refer to in the context of generators?
  • How long can pre-contingency thermal limits be sustained during an emergency?
  • If voltage levels are under emergency conditions, how quickly must remedial actions be taken?
  • During system restoration, capacitor banks should remain off until what percentage of the load is restored?
  • What must be reported if there is a change in flow of ≥ 100 MW at ≥ 500 kV?
  • What is the notice period required for updating on all transmission outages that are within 5 days?
  • In case of facility outages, how soon after should a notification be given for facilities rated 345 kV and below after taking them out?
  • What type of flows must be reported if there is a change of ≥ 25 MW?
  • What does EHV stand for in transmission terminology?
  • What does EEA2 refer to in PJM operations?
  • In terms of power dynamics, what does lower voltage imply about current?
  • Under what condition is a Manual Load Dump Warning issued?
  • In relation to voltage limits during pre-contingency, what is the maximum time allowed for high voltage situations?
  • What is the main purpose of the Heavy Load Voltage Schedule Warning?
  • What happens to reactive supply as voltage increases?
  • What does Dynamic Reserve consist of in terms of generator and system load?
  • What does a synchronized reserve relate to in terms of contingency?
  • The amount of Dynamic Reserve in an area must be sufficient for what purpose?
  • What threshold characterizes pre-contingency conditions during emergencies?
  • What is the appropriate response to exceeding normal limits during a load dump?
  • What is the method used to notify other PJM member companies of an outage for systems operating at 500kV or above?
  • What is typically required for Generators during emergency response actions?
  • In a Delta connection (3-phase power), what is true about the neutral?
  • What situation indicates a maximum generation alert?
  • What is the required notice for Generator Reactive Testing ticket submission?
  • What is essential for a Transmission Owner's plan regarding loss of function?
  • In a pre-contingency situation, what time frame is indicated for transfer limits?
  • What is the primary reason for having a performance assessment?
  • What percentage should frequency relaying not exceed when considering dynamic reserve?
  • What regular assessment must be conducted if PJM's systems are down?
  • Which system configuration is recommended for optimal cooling during operation?
  • How much notice is typically given for (Pre) Emergency Load Management Reduction Action?
  • What should PJM do with non-firm transactions not willing to pay congestion?
  • What triggers a Primary Reserve Alert?
  • How frequently does the assessment occur during the Performance Assessment Interval?
  • What is the purpose of a Hotline ticket request?
  • What problem is identified by excessive rotor angle swings?
  • What is the purpose of the Post-Contingency Local Load Relief Warning?
  • What is an advantage of a Blocking Carrier Scheme?
  • What is the maximum time allowed for a load dump post-contingency?
  • What is the required time to notify members after discovering a loss of interpersonal communication for more than 30 minutes?
  • What is the established procedure if the IROL limit is exceeded?
  • What is the restoration frequency range for transmission systems?
  • For facility outages rated 500 kV and above, how long before should notifications be sent?
  • Which of the following is NOT one of the emergency procedure levels?
  • Which action is associated with addressing an IROL violation?
  • To maintain system integrity, what is one method for managing generator operations during low frequency events?
  • How long does a Transmission Owner have to notify PJM of a communication capability failure that lasts 30 minutes or longer?
  • What is affected by the relationship between voltage and current in a transmission system?
  • What is the action taken to increase generation in emergency situations?
  • How many Black Start resources must be allocated to each transmission zone with a critical load requirement?
  • As the loading on a line increases, what happens to the heat generated in the line?
  • What does the pre-contingency transfer limit warning indicate?
  • When there is a loss of external load, ACE typically does what?
  • What happens to lines flowing towards a station when a line flowing towards it is lost?
  • What does a unit start-up notification signify?
  • If available primary reserve capacity is less than the largest operating generator, what should PJM issue?
  • Which procedure is NOT part of emergency actions taken by PJM?
  • Synchronized Reserve must be available within how many minutes for generation loading?
  • What is the correct response time for load dump in pre-contingency situations according to limits?
  • How does an increase in line loading affect I²R losses?
  • What happens during a forced outage?
  • When a line flowing out of a station is lost, what will happen to other lines flowing out of that station?
  • What does effective communication during outages enhance within PJM member companies?
  • A battery bank lasts how many hours?
  • What is the duration for handling load dump under post-contingency conditions?
  • What change is recommended regarding the reactive transfer back off limit during a Low Voltage Alert?
  • What is the fast scan rate for ACE and regulation megawatt values?
  • In pre-contingency scenarios, how long can normal voltage limits be maintained?
  • What does an Emergency mandatory load management reduction action aim to achieve?
  • How much lower should the emergency rating be compared to the Load Dump Rating?
  • Under emergency voltage limits in pre-contingency, what is the maximum allowed duration?
  • If a 6-day outage begins in October, when must it be submitted to be considered on time?
  • What is the primary purpose of the Emergency Voluntary Energy Only Demand Response Reduction Action?
  • Which factors contribute to heavy load alerts in electric systems?
  • What is the maximum duration for post-contingency thermal limits during an emergency?
  • What is a potential outcome when a generator experiences transient instability?
  • What should you press to acknowledge receipt of a message during a PJM All Call?
  • What is a critical parameter when monitoring the demand on generators?
  • What type of reserve must be carried to cover the largest energy contingency?
  • What action should be taken during emergency conditions for demand response customers?
  • How often is satellite phone testing required?
  • What high temperature usually results from short circuits or grounds in windings?
  • What is the Load Pick Up Factor for fossil steam?
  • A power system fault typically decreases ________ and increases __________.
  • What is the role of the Emergency Procedures Posting Application?
  • Which type of data is included in the OASIS network?
  • Which type of reserve allows a subsystem to recover quickly from contingencies?
  • At what high frequency do generators typically trip?
  • What is the impact on frequency and ACE during a loss of internal load?
  • Which high temperature can indicate a potential issue in the cooling systems?
  • How long may a load dump last under post-contingency rules?
  • At what low frequency do generators typically trip?
  • What is the Load Pick Up Factor for hydro generation?
  • If all generator resources are needed immediately, what action should be taken?
  • When does PJM assess selected double contingencies?
  • What is the notification time required before taking a facility outage for 500 kV and above?
  • What action is taken when the IROL limit has been exceeded for 5 minutes or longer?
  • What is the role of Dynamic Reserve in PJM Transmission?
  • What do PARs primarily manage in PJM?
  • What is characterized by the ability of the system to withstand small changes without loss of synchronization?
  • In what scenario is immediate action required for a transmission outage?
  • How quickly must load be shed during an IROL load shed action?
  • What is the Synchronized Reserve Requirement based on?
  • Which action would typically be taken FIRST to control a reactive transfer limit?
  • An Elevated Threat Alert warns of what type of threat?
  • What is the typical forced outage rate considered in Black Start critical load requirements?
  • Which relay type is most suitable for quick fault detection in transmission lines?
  • What is the minimum amount of generation required for an energized 500/765 kV line?
  • How many levels of emergency procedures are there?
  • What is the voltage limit for emergency post-contingency situations?
  • A generator is typically connected to the power system through which type of transformer?
  • Which statement regarding priority loads is true?
  • What are load pickup factors based on?
  • What component is characterized by voltage leading current?
  • What type of signal does a Guard (piloting relay) provide?
  • What is the deadline for submitting an outage request that is more than 5 days away?
  • If frequency decreases due to external generation loss, what will remain constant?
  • Which stability type assesses the generation's ability against disturbances over time?
  • How long are updates required for data outages without planned events?
  • What is the purpose of curtailing non-essential building load?
  • Which of the following scenarios leads to active control of reactive power flow?
  • In the event of a loss of external generation, what occurs to frequency and ACE?
  • What type of signal is associated with the TRIP (piloting relay)?
  • How is the adherence to voltage limits described during emergency pre-contingency situations?
  • When there is a loss of external load, what happens to frequency and ACE?
  • Which of the following best describes the outcome of a load pickup factor exceeding the safe operating level?
  • A 500kV line loaded at 250 MW primarily acts as what?
  • What is the sampling rate of the PJM Super Phasor Data Concentrator (SPDC)?
  • What percentage is required for Black Start resources to meet the critical load requirement?
  • What is the minimum voltage level mentioned for EHV substations?
  • Which principle is primarily affected when voltage drops in a power system?
  • What function does eDart serve in communication among dispatchers?
  • What frequency is considered ideal before restoring a block of load?
  • What is the maximum time before an ICCP failure is considered to be in an unknown state?
  • What does OASIS stand for in the context of PJM?
  • What refers to the ability of generation to remain in synchrony following severe disturbances?
  • What percentage is reflective of the minimum load required in a frequency bias setting?
  • Which set of EMS quality codes indicates a valid reading?
  • What kind of indicators can suggest excessive loading on windings?
  • What might a Transmission Owner be required to do if an EHV substation RTU becomes unavailable?
  • What is required of PJM dispatchers concerning actual flows during emergencies?
  • For a transmission outage request submitted under the one month rule, when must it be provided?
  • What is the implication of primary reserves falling below the specified requirement?
  • Which voltage configuration is likely necessary for black start generators?
  • How can you increase the reactive reserves of a generator?
  • What should be done if a generator frequency rises above 61.75 Hz?
  • No more than what percentage of the total dynamic reserve can consist of load with under frequency relay protection?
  • If PJM's monitoring systems are unavailable for longer than 15 minutes, what may they notify TOs of?
  • What does the action of deploying all resources involve?
  • What is the time limit for pre-contingency thermal limits under normal conditions?
  • How long is the duration that applies to normal post-contingency voltage limits?
  • What is the allowed duration for a load dump in pre-contingency thermal limits?
  • What is the purpose of adjusting tap changers in PJM operations?
  • During system restoration, what frequency must be maintained above by shedding load?
  • For outages related to data, what notification is issued shortly before the outage?
  • What is a common action taken during the PJM All Call?
  • What is the maximum load percentage that should not be restored at once according to PJM guidelines?
  • What is the notification requirement for a planned RTU outage?
  • How many hours prior should a Heavy Load Voltage Schedule Warning be sent before implementation?
  • What does RRC stand for in relation to total MVAR values?
  • Which of the following is NOT considered a critical load?
  • What are the primary reserves primarily comprised of?
  • What action is indicated by EEA3?
  • What is the maximum response time for high voltage conditions?
  • Which type of relaying is commonly used for transformer protection?
  • What voltage classification defines Extra High Voltage?
  • What should be done when the actual voltage drops below the load dump low voltage limit?
  • What does a telemetry failure indicate according to EMS quality codes?
  • In a Wye connection (3-phase power), how are the coils connected?
  • If a 500 kV line operates at 495 kV with a 200 kV capacitor, what voltage is effectively received?
  • Who is responsible for following a voltage schedule provided by the local TO or PJM?
  • If there is a loss of major generation, how frequently should updates be provided?
  • Which configuration of cooling fans is indicated for operations requiring oil circulation?
  • What does a (Pre) Emergency Load Management Reduction Action provide?
  • What does PCLLRW stand for?
  • What are the two types of emergency ratings in transmission systems?
  • What does the Imminent Threat Alert warn against?
  • For a 5-day outage starting in June, by when must the notice be submitted to be considered on time?
  • What is the restoration voltage range for effective transmission operation?
  • Which of the following is NOT a function of eDart systems?
  • What immediate action is required under the post-contingency transfer limit warning at 95%?
  • What is the term for relaying that depends on communication between line terminals?
  • What method allows for the natural circulation of oil through radiators?
  • How long does it take to respond to a post-contingency emergency voltage limit?
  • What aspect does the 6 month rule for outage requests emphasize?
  • What is the voltage requirement for generators that necessitate a voltage schedule?
  • What indicates a potential failure in cooling systems?
  • What is commonly done to enhance cooling during high-load operations?
  • What is the voltage limit for immediate action in pre-contingency scenarios?
  • What percentage is the Load Pick Up Factor for CT’s (Combustion Turbines)?
  • Under what condition is a Geomagnetic Disturbance Action cancelled?
  • When reducing voltage on the distribution side, how much should it typically be reduced?
  • What is the required update duration for changes in 500/345/230 kV tap positions?
  • How many business days in advance must eDart tickets be submitted?
  • What does 'TERM' refer to in transmission systems?
  • For Point to Point Validation, how much notice is required?
  • Wide-area voltage violations occur at transfer levels near which limit?
  • What is included in secondary reserves?
  • What is the required notice for a transmission outage due to an equipment problem or trip?
  • PJM dispatchers must return actual flows below emergency ratings within how many minutes?
  • What is the expected action for PJM members upon receiving emergency alerts?
  • What is the minimum generation requirement for connection at 230 kV or higher?
  • What is the desired relief timeframe that PJM members should aim for?
  • What is a Remedial Action Scheme (RAS) designed to do?
  • What is the action taken after a manual load dump is issued?
  • What indicates that an eDart ticket is listed as unavailable with respect to SE MVAR?
  • What is the SIL loading capacity mentioned for a 500 kV line?
  • Increased load on a circuit causes lower voltage at the remote end. Which of the following actions will increase this voltage?
  • What happens to reactive losses as current increases?
  • What is the regulation requirement as a percentage of load?
  • Which event would most likely trigger a need for Black Start resources?
  • What must be checked if a transmission outage was caused by tree contact?
  • What is the role of capacitor banks during system load restoration?
  • What is the update frequency for information regarding a loss of major generation?
  • The Heavy Load Voltage Schedule Action is issued during what condition?
  • What happens to frequency and ACE when there is a loss of internal generation?
  • Which component is associated with current leading voltage?
  • What is the minimum kV level for bus voltages that must be reported in the PJM system?
  • What is the most common connection type on the BES?
  • What is indicated by a Voltage Reduction Warning?
  • In the event of an unplanned data outage, how soon should an update be issued?
  • PJM will operate without violating which voltage rating on a continuous basis?
  • What percentage threshold should not be exceeded when restoring blocks of load relative to total synchronized generating capability?
  • Which is the top priority of outages?
  • Which of the following best describes planned outages?
  • What is the minimum time to return voltage levels to normal after they fall below the emergency low voltage limit?
  • Which of the following components are included to manage voltage in PJM?
  • What is the specified duration for normal voltage limits during pre-contingency?
  • What condition is described by steady state instability?
  • During a heavy load voltage schedule action, which voltage levels should increase MVAR output?
  • If switching will last more than one hour, what must be included in the equipment list according to eDart requirements?
  • What is the update frequency required in case of an RTU failure?
  • Which of the following is primarily monitored in an EMS quality code?
  • For facility outages rated 345 kV and below, what is the notification period prior to a planned outage?
  • When must a transmission ticket for a vegetation trip be reported to NERC?
  • How often must the outage assessments be communicated to associated dispatchers?
  • When is a Primary Reserve Warning issued?
  • How is EMS data exchange conducted between PJM and members?
  • A Geomagnetic Disturbance Warning is issued at what severity level or greater?
  • How should a Post-Contingency Local Load Relief Warning be communicated?
  • What is typically required when there is a failure in the TO analysis program?
  • What happens to reactive losses when line loading is above Surge Impedance Loading (SIL)?
  • What aspect is essential for the restoration of the transmission system?
  • A nuclear plant is required to submit a notice for outage how many weeks in advance?
  • What is the minimum frequency for updating measurement data in the PJM system?
  • What is a primary action taken when congestion occurs in PJM?
  • PJM specifies that reactive resources of what voltage must be switched at their direction?
  • What action should be taken after a PJM All Call if you want to repeat the message?
  • Synchronous Reserve can consist of which of the following?
  • What voltage rating must not be violated following a simulated facility or failure according to PJM?
  • What is the minimum time frame for giving notice of a transmission outage that is 5 days or less?
  • Which of the following measures is crucial for maintaining system stability?
  • Which frequency indicates a critical threshold that should be monitored to prevent generator issues?
  • What does N/A indicate regarding post-contingency thermal limits under normal conditions?
  • What kind of flow must be monitored at a capability of ≥ 25 MW?