Which action is associated with addressing an IROL violation?

Study for the PJM Transmission Test. Explore topics with flashcards and multiple-choice questions; hints and explanations included for every question. Ace your exam confidently!

When addressing an IROL (Interconnection Reliability Operating Limit) violation, it is crucial to take immediate and effective actions to ensure grid reliability. Among the given options, the action that is specifically associated with addressing an IROL violation is a Manual Load Dump Warning.

In the context of transmission operations, an IROL violation indicates that the transmission system is operating beyond safe limits, which could compromise reliability. A Manual Load Dump Warning entails the deliberate reduction of generation or the disconnecting of loads to relieve stress on the grid and bring it back within safe operating limits. This is an urgent response intended to stabilize the system and prevent further risk, as IROL violations can lead to system instability or blackouts.

The other actions listed, while relevant to various operational issues within the power system, do not directly pertain to the immediate response needed for an IROL violation. For instance, a Voltage Reduction Warning might indicate a need to adjust voltages due to various conditions. A Maximum Generation Alert would inform operators of the generation capacity nearing its ceiling but does not specifically address an IROL. A Primary Reserve Alert relates to the availability of backup generation but does not involve immediate corrective actions for IROL violations. Thus, the Manual Load Dump Warning is the most appropriate response in

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy