What is the minimum amount of generation required for an energized 500/765 kV line?

Study for the PJM Transmission Test. Explore topics with flashcards and multiple-choice questions; hints and explanations included for every question. Ace your exam confidently!

The minimum amount of generation required for an energized 500/765 kV line is essential for maintaining voltage stability and ensuring the line operates effectively. In the context of high voltage transmission lines, a certain level of active power generation needs to be present to meet the load demands and improve system reliability.

For 500/765 kV lines, the amount of generation is typically significant due to the nature of the transmission system, which operates at high voltages to effectively move large amounts of power over long distances. The correct answer indicates that a minimum of 30 MW is necessary to maintain system balance and operability for these high voltage lines. This level of generation is critical for mitigating issues that could arise from load fluctuations or unexpected outages, preserving the integrity of the transmission network, and adhering to grid operational guidelines.

Other options suggest lower levels of generation, which would not provide sufficient support for the demands placed on such high capacity lines. Thus, the choice of 30 MW reflects a critical threshold in the reliability and efficiency of high voltage power transmission.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy